Renewable Power Evacuation

Evacuation lines, bays and switchyards connecting solar parks, wind farms, hybrid and small-hydro plants to the grid.

Overview

From solar parks to wind farms and small-hydro plants on canal networks, we connect generation to the grid — combining transmission lines, feeder bays and switchyards with the GETCO feasibility, approvals and clearances that grid connection requires.

Scope of work

  • Power-evacuation lines from solar, wind and hybrid plants
  • Feeder bays and remote-end switchyards at GETCO substations
  • Evacuation works for small-hydro plants on SSNNL canals
  • GETCO feasibility, estimate processing and final clearances

Related projects

View all 9 related projects

220 kV

Completed

Surel Solar Park

Client
Torrent Power
Voltage
220 kV
Length
41.00 km
Also
1 no. substation
Scope of work

EPC of 220 kV S/C line from Surel Solar Park to GETCO Bechraji substation, along with 1 no. substation.

  • Transmission line
  • Substation & bays
  • Renewable evacuation

220 kV

Completed

Shikarpur WF – Samakhiyali Line

Client
GETCO
Voltage
132 kV / 220 kV
Length
12.590 km
Scope of work

EPC of 132 kV D/C Shikarpur WF – Samakhiyali line at 220 kV Vondh S/S on 132 kV D/C & 220 kV M/C towers with ACSR Panther conductor and OPGW cable.

  • Transmission line
  • Renewable evacuation

33 kV

Completed

SECI V Hybrid Project

Client
Adani
Voltage
33 kV
Length
44 km
Scope of work

Establishment of 33 kV S/C transmission line (44 km) for the SECI V hybrid project.

  • Transmission line
  • Renewable evacuation

400 kV

Completed

Charanka SS — 105 MW Solar Evacuation

Client
ReNew Power
Voltage
220 kV / 400 kV
Length
12.27 km
Capacity
105 MW solar plant
Scope of work

220 kV S/C transmission line from the 105 MW ReNew solar plant to the 400 kV Charanka GETCO substation, and a 220 kV feeder bay at the 400 kV Charanka substation for the 105 MW solar power plant — both on turnkey basis.

  • Transmission line
  • Substation & bays
  • Renewable evacuation

400 kV

Completed

GUVNL Solar Plant — 400 kV Remote-End Switchyard

Client
Adani Renewables
Voltage
400 kV
Length
21 km
Capacity
250 MW (100 MW + 150 MW)
Scope of work

400 kV remote-end switchyard for the 250 MW (100 MW + 150 MW) GUVNL solar plant.

  • Substation & bays
  • Renewable evacuation

132 kV

Completed

132 kV Electrical Project under MPPTCL (Solar Plant)

Client
Schneider Electric
Voltage
132 kV
Scope of work

132 kV BE electrical project under MPPTCL — civil and electrical works (solar plant).

  • Substation & bays
  • Renewable evacuation

Planning a transmission, substation or cabling project?

Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.