66 kV and 220 kV XLPE underground cable laying, line conversion to UG cable and multi-year annual rate contracts.

Overview

Hem Engineers is registered with GETCO for underground cable work (‘C’ Class). We lay EHV XLPE cable systems for new links and for converting overhead sections to underground — including multi-zone annual rate contracts (ARC) for GETCO.

Scope of work

  • 66 kV and 220 kV XLPE cable laying, including FO cable
  • Partial undergrounding of overhead lines and line shifting by UG cable
  • Annual rate contracts (ARC) for cable laying across GETCO zones
  • Supply of cable and all required material as per GETCO specification

Related projects

View all 7 related projects

66 kV

Ongoing

ARC E-250 — 66 kV Cable Laying (Packages 1 & 2)

Client
GETCO
Voltage
66 kV
Also
2-year rate contract
Scope of work

Various lines for a period of 2 years — Package-1 for Bharuch & Mehsana Zone and Package-2 for Rajkot Zone — against Tender No. ACE(P&C)/Contract/E-250/66 kV Cable Laying Works.

  • Underground cable

66 kV

Ongoing

ARC E-250 — Shil to Lohej UG Cable

Client
GETCO
Voltage
66 kV
Length
5.200 km
Scope of work

66 kV UG cable laying work for the 66 kV S/C line from the existing 66 kV Shil S/S to the new 66 kV Lohej S/S with 1C, 630 sq.mm (3+1) XLPE cable.

  • Underground cable

220 kV

Completed

Vondh – Bhachau Line

Client
Vikran Engineering Limited
Voltage
220 kV
Length
7.00 km
Scope of work

Vondh – Bhachau line on D/C towers with ACSR Zebra conductor and OPGW, with partial laying of 220 kV, 800 sq.mm (2+1) Al. corrugated UG cable, for drawl of 5 MW power by M/s Western Railway for Bhachau TSS.

  • Transmission line
  • Underground cable
  • Railway traction supply

66 kV

Completed

Chitra GSS to BVP TSS

Client
Indian Railways
Voltage
66 kV
Length
5 km UG + 8.35 km OH
Location
Gujarat
Scope of work

66 kV transmission line LILO from Chitra GSS to BVP TSS and from Vavera GSS to Rajula TSS, under Railway Electrification, Ahmedabad Unit, in Gujarat.

  • Transmission line
  • Underground cable
  • Railway traction supply

66 kV

Completed

ARC E-32 — Various 66 kV Lines

Client
GETCO
Voltage
66 kV
Also
2-year rate contract
Scope of work

66 kV 1C 300 sq.mm and 1C 630 sq.mm XLPE cable (PolyAL and Al. corrugated) for various lines, for a period of 2 years.

  • Underground cable

220 kV

Completed

ARC — 220 kV Underground Cable

Client
Indian Railways
Voltage
220 kV
Scope of work

Underground cable of 220 kV, 1C, 1200 sq.mm XLPE-insulated power cable (3+1) with FO cable, inclusive of all required material, as per GETCO specification.

  • Underground cable

Planning a transmission, substation or cabling project?

Talk to our team about scope, approvals and execution — from GETCO feasibility through to final CEIG clearance.